Sacramento, California – Nearly four miles of Fruitridge Road could look different under a proposed safety plan, and Mayor Pro Tem Eric Guerra is urging residents to help shape the changes before the draft becomes final.
In a social media announcement, Guerra pointed residents toward the Fruitridge Road Safety and Mobility Plan and a December 11, 2026, deadline for public feedback. “And hearing from the community is key to moving a large-scale plan like this forward,” he wrote.

The project stretches between Riverside Boulevard and Stockton Boulevard, crossing city and county jurisdictions. It covers a corridor on Sacramento’s Vision Zero High Injury Network, which identifies streets with the highest numbers of fatal and severe-injury crashes involving people walking, biking and driving. The city also identifies Fruitridge Road as a high transportation priority.
The draft proposes reducing vehicle travel lanes from four to two, with a center turn lane, and adding bike lanes separated from traffic by raised concrete buffers. Plans for portions of the corridor also include shade trees and landscaped buffers. In the middle section, between Gilgunn Way and 24th Street, the proposal would remove parking from one side of the frontage road.

Those concepts follow earlier rounds of public input and traffic analysis. City staff also examined potential traffic shifts onto nearby roads, particularly Freeport Boulevard and Sutterville Road, as part of developing the draft.
Residents have opportunities to discuss the proposals in person. A pop-up workshop is scheduled for November 18 from 5 to 7 p.m. at the Fruitridge light rail station. Another is planned for November 21 from 10 a.m. to noon at Belle Cooledge Library.

The broader goal is to make everyday trips safer and improve access to schools, parks, businesses and transit for people of all ages and abilities. Residents can review the draft, find feedback information and sign up for updates through the city’s project webpage.
After comments close, staff will refine the plan and seek a commission recommendation for City Council adoption in winter or spring 2027. Future implementation phases will require grant funding, making this review period a chance to influence the design before those next steps.